SOP 01-22 ADMINISTRATIVE ACTION ON CONTRACTS WITH NEGATIVE SLIPPAGE FOR PCG INFRASTRUCTURE PROJECTS

By: CGIDS
This SOP prescribes the rules, policies, guidelines and procedures to contractors, implementing units, and procuring entities on the actions to be undertaken when the infrastructure project incurred negative slippage in the implementation of infrastructure projects under PCG contract.
Category: STANDING OPERATING PROCEDURE

Open Download
SOP 02-22 PREPARATION OF THE ENGINEERING DOCUMENTATION OF A PROPOSED PCG INFRASTRUCTURE PROJECTS DURING PRE-PROCUREMENT PHASE

By: CGIDS
This SOP prescribes the guidelines in the preparation of complete engineering documents for the proposed PCG infrastructure projects through preliminary engineering and detailed engineering design.
Category: STANDING OPERATING PROCEDURE

Open Download
SOP 07-22 GUIDELINES IN THE PREAPARATION OF DAILY ACTIVITY REPORT (DAR), WEEKLY ACCOMPLISHMENT REPORT (WAR) AND STATEMENT OF WORK ACCOMPLISHMENT (SWA) FOR ALL PCG INFRASTRUCTURE PROJECTS

By: CGIDS
The purpose of this SOP is to set guidelines and procedures in the preparation of Daily Activity Report (DAR), Weekly Accomplishment Report (WAR) and Statement of Work Accomplishment (SWA) in order to monitor the contractor’s performance and progress during the implementation of PCG infrastructure projects.
Category: STANDING OPERATING PROCEDURE

Open Download
CIR 12-22 SPACE ALLOCATION STANDARDS OF PHILIPPINE COAST GUARD BUILDINGS AND OFFICES

By: CGIDS
To enhance the mobility of persons and the accessibility of the working area within PCG building or offices.
Category: CIRCULAR

Open Download
CIR 16-22 STANDARD COLOR SCHEME FOR PHILIPPINE COAST GUARD BUILDINGS AND SIGNBOARD FOR PCG OFFICES AND OTHER FACILITIES

By: CGIDS
The purpose of this circular is to set the standard color scheme and signages for PCG building and other facilities.
Category: CIRCULAR